BedHeldEnd DtTm: Difference between revisions

JMojica (talk | contribs)
JMojica (talk | contribs)
Line 57: Line 57:
***for last date -  consider the Bed held Tm  
***for last date -  consider the Bed held Tm  
*Extra Bed held Occupancy per day = sum of extra bed occupied by all patients with bed held in a given day
*Extra Bed held Occupancy per day = sum of extra bed occupied by all patients with bed held in a given day
*The Extra Bed held Occupancy will be reported along with the Bed Occupancy derived from  [[Admit DtTm]] to [[Dispo DtTm]] (the later is also refer as '''Total Patient Days''').


== Consistency Checks ==
== Consistency Checks ==