DeviceUse Study: Difference between revisions

JMojica (talk | contribs)
LKolesar (talk | contribs)
Line 44: Line 44:
**** Home bipap or cpap is included in this study.   
**** Home bipap or cpap is included in this study.   
* If the device is '''removed or stopped for a few days''' and then a new device is used, a new set of entries is required to get an accurate duration for the device.   
* If the device is '''removed or stopped for a few days''' and then a new device is used, a new set of entries is required to get an accurate duration for the device.   
* If the patient is in ventilator on admission, choose the device "ETT in & vent start" and not the "zVent start"
 
*Each item must have a partner:  For example if central line "in" is an option, then central line "out" must be entered.  If it remains in after discharge then the box is ticked in the "out" option.  "Start" items must be paired with "stop" items and "in" items must be paired with "out" items.  When you send, if the paired items are not entered for your completed pts, you will get a list of errors when you check your pre-send checker.   
*Each item must have a partner:  For example if central line "in" is an option, then central line "out" must be entered.  If it remains in after discharge then the box is ticked in the "out" option.  "Start" items must be paired with "stop" items and "in" items must be paired with "out" items.  When you send, if the paired items are not entered for your completed pts, you will get a list of errors when you check your pre-send checker.   
** Another example: when both "ETT in and Vent start" are simultaneous , then decided to stop the vent but kept the ETT in and then the ETT was removed later on another date, only 3 date_times should be recorded namely 1) ETT_in & Vent_start, 2) Zvent_stop, 3) ZETT_out. Despite only having 3 dates, the partners are satisfied (eg. ETT_in & vent_start will be partner for both Zvent_stop and ZETT_out).
** Another example: when both "ETT in and Vent start" are simultaneous , then decided to stop the vent but kept the ETT in and then the ETT was removed later on another date, only 3 date_times should be recorded namely 1) ETT_in & Vent_start, 2) Zvent_stop, 3) ZETT_out. Despite only having 3 dates, the partners are satisfied (eg. ETT_in & vent_start will be partner for both Zvent_stop and ZETT_out).
Line 53: Line 53:
****"ZVent start" and "ZVent stop"
****"ZVent start" and "ZVent stop"
*** Example of NOT valid pairings  
*** Example of NOT valid pairings  
****"ETT in and Vent start" and "ZETT_stop" followed by "ZVent_out"
****"ETT in and Vent start" and "ZETT_out" followed by "ZVent_stop"
****"ETT in and Vent start" and "ZETT_stop" only
****"ETT in and Vent start" and "ZETT_out" only
****"ETT in and Vent start" and "ZVent_out" only
****"ETT in and Vent start" and "ZVent_stop" only
****"ZETT in" and "ETT out and Vent stop"
****"ZETT in" and "ETT out and Vent stop"
****"ZETT in" and "ZVent_out"
****"ZETT in" and "ZVent_stop"
****"ZVent start" and "ETT out and Vent stop"
****"ZVent start" and "ETT out and Vent stop"
****"ZVent start" and "ZETT out"
****"ZVent start" and "ZETT out"