Eds and raw pull from x manual.vbs: Difference between revisions
TOstryzniuk (talk | contribs) mNo edit summary |
TOstryzniuk (talk | contribs) |
||
| Line 15: | Line 15: | ||
==Future Plan== | ==Future Plan== | ||
Set up as scheduled task. Note, when we move to New centralized system this process will be stopped. The | Set up as scheduled task. Note, when we move to New centralized system this process will be stopped. The plan is that this task will stop by end of May or June 2014. | ||