Eds and raw pull from x manual.vbs: Difference between revisions

TOstryzniuk (talk | contribs)
mNo edit summary
TOstryzniuk (talk | contribs)
Line 15: Line 15:


==Future Plan==
==Future Plan==
Set up as scheduled task.  Note, when we move to New centralized system this process will be stopped.  The hopes that it will stop by end of May.  
Set up as scheduled task.  Note, when we move to New centralized system this process will be stopped.  The plan is that this task will stop by end of May or June 2014.