Overstay Project Start Stop dates
Jump to navigation
Jump to search
Legacy Content
This page contains Legacy Content.- Explanation: Stopped everywhere as of October 1, 2019
- Successor: No successor was entered
Click Expand to show legacy content.
Overstay V2, no DPST or green
Start Date
- STB, HSC, GRA, VIC: July 31.17
Stop Date
- ALL sites -stop for any new admission as of October 1, 2019. Any outstanding admissions that are prior to October 1, 19 must have overstay color generated. -- Trish Ostryzniuk 16:37, 2019 November 18 (CST)
- VIC - up to October 2, 2017 midnight, then stop
Original Overstay project
green, yellow and red, included DPST form.
Stop Date
- HSC
- B3, H4, H4H, A4, D4, D5: November 5, 2015
- stopped DPST form, putting dots on charts & filling in transition coordinator binder.
- CONTINUED to: generated a color
- B3, H4, H4H, A4, D4, D5: November 5, 2015
Start Date
- HSC
- B3, H4, H4H, A4, D4, D5: May 13, 2013
- VIC
- S3, S4, N5, S5 AND the overflow beds February 11, 2013
- GRA
- N3, W3: October 1, 2012
- N5: July 23, 2012
- STB
- 5B: November 19, 2012 (Training starting in November 5th 2012)
- E6: November 13, 2012 (Training starting the week of October 2012 29th
- E5: November 5, 2012 (Training starting in October 23th and 24th 2012). Database study number 91429.
- ward stopped filling in DPST forms between Oct 9- ?.16 for local site "experiment" using an Emergency safety checklist form. Has not resumed. To be address with Regional Medicine Directors and to next steps.Trish Ostryzniuk 13:41, 2016 October 26 (CDT)
- CONTINUE to generate a color.
- ward stopped filling in DPST forms between Oct 9- ?.16 for local site "experiment" using an Emergency safety checklist form. Has not resumed. To be address with Regional Medicine Directors and to next steps.Trish Ostryzniuk 13:41, 2016 October 26 (CDT)