PT PTT: Difference between revisions

From CCMDB Wiki
Jump to navigation Jump to search
m (m)
Line 14: Line 14:
== legacy collection instruction ==
== legacy collection instruction ==
Count one for either a PT or a PTT or an INR. '''Any one, two or all''' of these coags would constitute a count of ONE when done at the same time. Examples:  a PT is only done (this is a count of one); a PT and a PTT are done (this is a count of one); a PT, PTT and INR are done (this is a count of one). TASK Team reviewed Oct 19.15.  
Count one for either a PT or a PTT or an INR. '''Any one, two or all''' of these coags would constitute a count of ONE when done at the same time. Examples:  a PT is only done (this is a count of one); a PT and a PTT are done (this is a count of one); a PT, PTT and INR are done (this is a count of one). TASK Team reviewed Oct 19.15.  
{{Discuss@task
| TaskQuestion =  There are two options for the PT,PTT, IRN data namely combined as one if done at same time or have PT, PTT and IRN separately counted? How is the data being used? if to be done separately onwards, the trending  across time will have an issue since the manual collection is based on combined data. }}


[[Category: Labs]]
[[Category: Labs]]
[[Category:Take to Task team meeting|*]]

Revision as of 14:44, 2017 July 4

Data Element (edit)
Field Name: PT_PTT
CCMDB Label: not stated
CCMDB tab: not stated
Table: L_Labs_Flowsheet
Data type: integer
Length: integer
Program: CC
Created/Raw: Raw
Start Date: 1988-07-11
End Date: 2300-01-01
Sort Index: 5

PT_PTT contains the number of PTs and PTTs done during a patient's stay in our unit.

  • SMW

Legacy implementation right in the table

  • Cargo


  • Categories
  • Forms



This field is acquired as part of the DSM data#DSM results we store. It used to be collected manually until 2017-03-17.

legacy collection instruction

Count one for either a PT or a PTT or an INR. Any one, two or all of these coags would constitute a count of ONE when done at the same time. Examples: a PT is only done (this is a count of one); a PT and a PTT are done (this is a count of one); a PT, PTT and INR are done (this is a count of one). TASK Team reviewed Oct 19.15.

Template:Discuss@task