Query check CCI Date
Data Integrity Checks | |
Summary: | Px Date must be sensible when compared to Accept_DtTm and Dispo_DtTm |
Related: | Px Date, Accept_DtTm, Dispo_DtTm, Px Type |
Firmness: | hard check |
Timing: | complete |
App: | CCMDB.accdb |
Coding: | query check_CCI_Date |
Uses L Problem table: | not relevant for this app |
Status: | implemented |
Implementation Date: | 2018-10-14 |
Backlogged: | true |
If this check changes, consider whether Query check ICD10 date should be changed the same way.
- If exists, Px_Date must be between Accept_DtTm and Dispo_DtTm
- Px_Date mandatory for procedures with Px Type acquired / Acquired Procedure
- Px_Date not allowed for procedures with Px Type admit / Admit Procedure
Log
- 2021-03-24 - Julie flagged a false negative that was probably from before the last log
- 2021-01-20 - confirmed that both dates before admit and after dispo are caught.
- 2020-10-15 - changed start limit from Arrive DtTm to Accept DtTm since we now collect data on pts starting at ER arrival, and the EMIP distinction is going away.