Reconnect CFE and initial error checks: Difference between revisions

From CCMDB Wiki
Jump to navigation Jump to search
No edit summary
m (Text replacement - "{{DT" to "{{TT")
Line 4: Line 4:
* Click the "Re-connect Data" button
* Click the "Re-connect Data" button
* Screen prompt 'Could not find file ... DSM...', answer '''YES'''
* Screen prompt 'Could not find file ... DSM...', answer '''YES'''
{{DT | Fix why it gives this error as part of fixing DSM process.  }}
{{TT | Fix why it gives this error as part of fixing DSM process.  }}
* The program will now reset the connections from [[CFE]] to [[Centralized data.mdb]], [[PHI.mdb]] and [[TISS28 Data.mdb]]
* The program will now reset the connections from [[CFE]] to [[Centralized data.mdb]], [[PHI.mdb]] and [[TISS28 Data.mdb]]
* the reconnector will confirm if [[L_Log table]] and [[L_PHI table]] have the same records in them. If they don't there will be an error; see [[Procedure when there are differences between L Log and L PHI]] for how to proceed
* the reconnector will confirm if [[L_Log table]] and [[L_PHI table]] have the same records in them. If they don't there will be an error; see [[Procedure when there are differences between L Log and L PHI]] for how to proceed
Line 11: Line 11:
** [[PL missing L Tables content]]  
** [[PL missing L Tables content]]  
*** for now there are some CCIs on this list.  
*** for now there are some CCIs on this list.  
{{DT |Tina will fix [[Query check CCI must have entry]] so those are caught going forward. }}
{{TT |Tina will fix [[Query check CCI must have entry]] so those are caught going forward. }}
*** Generally, errors in missing are the result of a failed send, so follow [[Cleaning up a failed send]] to fix.
*** Generally, errors in missing are the result of a failed send, so follow [[Cleaning up a failed send]] to fix.
{{DT | re-name these so not PL any more }}
{{TT | re-name these so not PL any more }}
* Continue what you were doing, likely the next step of [[Centralized data Vetting Process]]:  [[Pre-linking checks]]
* Continue what you were doing, likely the next step of [[Centralized data Vetting Process]]:  [[Pre-linking checks]]



Revision as of 16:53, 2020 May 5

Once you "Pull" Centralized data.mdb you need to initialise the program and make sure that you have consistent initial data.

Instructions

  • Click the "Re-connect Data" button
  • Screen prompt 'Could not find file ... DSM...', answer YES

Fix why it gives this error as part of fixing DSM process.

  • added: no added date
  • action: no action date
  • Cargo


  • Categories

Tina will fix Query check CCI must have entry so those are caught going forward.

  • added: no added date
  • action: no action date
  • Cargo


  • Categories

re-name these so not PL any more

  • added: no added date
  • action: no action date
  • Cargo


  • Categories

Related articles

Related articles: