Function LOS(): Difference between revisions
Ttenbergen (talk | contribs) mNo edit summary |
Ttenbergen (talk | contribs) No edit summary |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
Function LOS() takes a Pat_ID as parameter and calculates the LOS as follows: | Function LOS() takes a Pat_ID as parameter and calculates the three-decimal-point [[LOS]] as follows: | ||
::Round(dis_dttm - ad_dttm, 3) | ::LOS = Round(dis_dttm - ad_dttm, 3) | ||
See also [[Function LOS int()]]. | |||
== Log == | == Log == | ||
* 2022-05-11 - added [[Function LOS int()|Function LOS int()]] to work where an integer result, ie the number of days, is required. | |||
* 2022-04-28 - updated how this is calculated to be consistent with how it's done in created variables common: Round(dis_dttm - ad_dttm, 3) ''was WorksheetFunction.Ceiling((dis_dttm) - (ad_dttm), 1)''; updated both CCMDB and CFE. | * 2022-04-28 - updated how this is calculated to be consistent with how it's done in created variables common: Round(dis_dttm - ad_dttm, 3) ''was WorksheetFunction.Ceiling((dis_dttm) - (ad_dttm), 1)''; updated both CCMDB and CFE. | ||
* 2022-02-10 - Updated function to use [[Created_AdmitDtTm query]]/[[Admit DtTm]] as input instead of Arrive DtTm | * 2022-02-10 - Updated function to use [[Created_AdmitDtTm query]]/[[Admit DtTm]] as input instead of Arrive DtTm | ||
| Line 8: | Line 10: | ||
== Related articles == | == Related articles == | ||
{{Related Articles}} | {{Related Articles}} | ||
[[Category:Length of stay]] | |||
[[Category:CCMDB.accdb]] | |||