Critical Care Program Quality Indicator Report: Difference between revisions

JMojica (talk | contribs)
JMojica (talk | contribs)
Line 61: Line 61:
*** Check on the X-axis if the last scale is the current period  
*** Check on the X-axis if the last scale is the current period  
*** Look for any change in the pattern and re-calculate the control limits
*** Look for any change in the pattern and re-calculate the control limits
** Once all charts are OK, select the charts in groups and save them as .png image on  R:\Critical Care QIT\Director_Report\Images
** Once all charts are OK, select the charts and save them as .png image on  R:\Critical Care QIT\Director_Report\Images  
*** Select charts in small groups (not all charts at once) because the software cannot handle too large number. Just continue the process until all the needed charts are saved into images.
*Third part - Go to R:\Critical Care QIT\Director_Report\Report and review all the *.pptx files  
*Third part - Go to R:\Critical Care QIT\Director_Report\Report and review all the *.pptx files  
** All the inserted images in the PowerPoint files are automatically updated when the images from SQC are updated.
** All the inserted images in the PowerPoint files are automatically updated when the images from SQC are updated.