Requested CCMDB changes for the next version: Difference between revisions

TOstryzniuk (talk | contribs)
No edit summary
m Pharm Flow & L_Pharm_Flowsheet_sum: This had nothing to do with the sum function, discussed with Trish.
Line 10: Line 10:


* as per Lois, and confirmed by other collectors at the team meeting: "Every once in a while when I open my files the ADL’s appear on my registry page for CICU. I go in and out and they disappear."; have asked if anyone can provide specific steps that can make this happen. [[User:Ttenbergen|Ttenbergen]] 18:42, 2012 June 7 (CDT)
* as per Lois, and confirmed by other collectors at the team meeting: "Every once in a while when I open my files the ADL’s appear on my registry page for CICU. I go in and out and they disappear."; have asked if anyone can provide specific steps that can make this happen. [[User:Ttenbergen|Ttenbergen]] 18:42, 2012 June 7 (CDT)
===Pharm Flow & L_Pharm_Flowsheet_sum===
===L_Pharm_Flowsheet_sum===
* ''Can't check L_pharm_flow complete if there is no time for discharge''. (Thanks Joyce for bringing that piece of the puzzle) [[User:Ttenbergen|Ttenbergen]] 13:10, 2012 June 18 (CDT)
Occasionally a data collector has sent data with more than one line of pharmacy for a patient. Still looking into what causes this. [[User:Ttenbergen|Ttenbergen]] 15:07, 2012 June 18 (CDT)
**Trish & Julie Reviewed L_Pharm & L_Pharm_Flowsheet_sum.  The intergrity check that sums the drugs does not work if discharge time is not entered. We weren’t aware that the discharge time is not always available for collectors and that would hold up calculating totals to L_pharm_flowsheet_sum. 
**Julie suggestion is this:  ''' do not''' to use (LOS with date and time) + 2. 
***'''Use the following:  (Discharge date – admit date) + 1.'''  With this formula, you will need to worry about having a discharge time in order to calculate pharmacy totals.
**Example:
***Admit date June 13.12
***Discharge Date June 13.12
***This is the same day, there for it would become zero. That is why it is suggested to add +1. 
**Another example:
***Admit date: June 12
***Discharged: June 14
***14-12 =2 days however, we need to include the first day also therefore, so with the addition of +1 this would capture 3 days.
****This will definitely solve Joyce’s concerns for sure.[[User:TOstryzniuk|Trish Ostryzniuk]] 14:34, 2012 June 18 (CDT)
 


== Collection tool improvement requests ==
== Collection tool improvement requests ==