PHI copy automation: Difference between revisions
TOstryzniuk (talk | contribs) m →Problem: Main office: if X drive goes down - effect on a scheduled task and what to do |
TOstryzniuk (talk | contribs) m →If X drive goes down: Main office - spelling fix |
||
| Line 26: | Line 26: | ||
IMPORTANT: | IMPORTANT: | ||
If main office notices that X drives is down, Data processor must not remove the csv files from the Regional server until: | If main office notices that X drives is down, Data processor must not remove the csv files from the Regional server until: | ||
*Trish computer | *Trish computer needs to be rebooted and network connection to X is need to be check if it has been re established. Otherwise this bat files is not able to do its job. | ||
** | **occurrence: Monday June 15.14 at 1700 hrs and all day June 16.14: issue: Castrophic hardware failure on this network drive had occurred. | ||
[[Category: 2013 data upgrades]] | [[Category: 2013 data upgrades]] | ||
[[Category:Scheduled Tasks]] | [[Category:Scheduled Tasks]] | ||