Change Priorities: Difference between revisions
TOstryzniuk (talk | contribs) m →NDC CLI and VAP: m |
TOstryzniuk (talk | contribs) m →Prioritized List of Changes: Tina |
||
| Line 5: | Line 5: | ||
== Prioritized List of Changes== | == Prioritized List of Changes== | ||
Main office team priorities. Please fill in from [[:Category:Potential Change]] | Main office team priorities. Please fill in from [[:Category:Potential Change]] | ||
===[[Multiple encounter consistency checks]] === | |||
*Linking - priority because alot of report rely on it.[[User:TOstryzniuk|Trish Ostryzniuk]] 12:56, 2014 September 23 (CDT) | |||
*Negative discharge dt adm date diff (overlap, duplicate) | |||
*Large diff in time | |||
*Short diff but inconsistent locations (incl EMIP) | |||
Ttenbergen 13:56, 2014 August 18 (CDT) | |||
--[[User:TOstryzniuk|Trish Ostryzniuk]] 17:43, 2014 May 2 (CDT) | |||
===Re Import TMPV2 into centralized front end=== | ===Re Import TMPV2 into centralized front end=== | ||
All projects that required at DATE that were imported into L_TMPV2 are missing these dates. See Pagasa for details of forensic findings.15:31, 2014 September 16 (CDT) | All projects that required at DATE that were imported into L_TMPV2 are missing these dates. See Pagasa for details of forensic findings.15:31, 2014 September 16 (CDT) | ||
| Line 16: | Line 24: | ||
*** we had a glitch with this on Thursday where Pagasa ended up with inconsistent numbers of records in phi and centralized. Luckily, a re-push and pull fixed it and should fix it in future. That should not have happened, though, so monitoring this. Ttenbergen 11:12, 2014 September 8 (CDT) | *** we had a glitch with this on Thursday where Pagasa ended up with inconsistent numbers of records in phi and centralized. Luckily, a re-push and pull fixed it and should fix it in future. That should not have happened, though, so monitoring this. Ttenbergen 11:12, 2014 September 8 (CDT) | ||
===Review Pagasa's backup process=== | ===Review Pagasa's backup process=== | ||