Evergreening of data collector laptops: Difference between revisions
TOstryzniuk (talk | contribs) m For tina |
Ttenbergen (talk | contribs) m moved details here from my outlook task... |
||
Line 1: | Line 1: | ||
We aim to "evergreen" our laptops by replacing 1/3 of them every year, meaning none should usually be older than 3 years. | |||
== ongoing log == | |||
2015-03-05 Tom has ordered 3 and asked Randy to order 3 as well. | |||
2015-03-02 rubber Dells are painfully slow now w windows; getting quote for early replacement for steering from Tom | |||
2015-01-19 the next bunch of laptops to replace are: (2 more Aug and Nov 2016) | |||
GRA_MICU GHDW210X36XDVW1 GRA_MICU 36XDVW1 11-Mar-2013 03-Mar-2016 Yes | |||
HSC_D4 HSGF216XJ5XDVW1 (?) HSC H4? J5XDVW1 11-Mar-2013 03-Mar-2016 No | |||
VIC_S5 VGDATACOG5XDVW1 VIC_S5 G5XDVW1 11-Mar-2013 03-Mar-2016 Yes | |||
GRA_N5 GHDW210XH5XDVW1 GRA_N5 H5XDVW1 11-Mar-2013 03-Mar-2016 Yes | |||
GRA_N3 GHDW210X16XDVW1 GRA_N3 16XDVW1 11-Mar-2013 03-Mar-2016 Yes | |||
VIC_S4 VGDATACO26XDVW1 (?) may have been VicS4S3 26XDVW1 11-Mar-2013 03-Mar-2016 No | |||
2015-01-15 emailed Brandon to see if he still wants to do testing or I can roll out… | |||
2014-12-22 Brandon Deamel seems to want to test something so leaving at my desk for now. Snooze to Jan to hear back from him. | |||
2014-12-15 Turns out it was being set up at HSC instead; done and at my desk now | |||
Conc laptop is being set up at Conc, by Lloyd Flores | |||
emailed Brian Fraser to please image these here so I can test and finish setup before traveling to site | |||
2014-12-11ish … inc 864997 | |||
2014-12-10 Tom emailed that one Medicine laptop is available now; asked if it had to be med and when the other two would be here. 2 need to go to StB better to make it one trip. | |||
2014-12-08 Tom says Randy has the forms… asked about follow up | |||
2014-12-01 FU email to Tom re. extra laptop | |||
2014-11-20 found out that I missed one of the STB laptops; asked Tom to order. Also talking with eHealth about the remaining non-W7 laptops | |||
deployed Lorri’s PC. | |||
2014-11-12 confirmed working; emailed Lorri Pruden for setup time | |||
2014-11-06 | |||
set up ccmdb starter w network | |||
fix copy desktop | |||
confirm laptop setup | |||
2014/Nov/3 got the two laptops, setting Laura’s up now, booked to deliver Thursday | |||
2014/Oct/29 laptops are here, John Stewart is setting them up; being set up for Oaks and StB Laura | |||
2014/Oct/06 emailed Brian for follow-up; OOO back Oct 20 | |||
2014/Sep/18 emailed Tom again; Brian Fraser emailed back, request has just gone to finance | |||
2014/Sep/08 Tom replied that he will fu | |||
2014/Sep/04 emailed Tom for update | |||
2014/Aug/18 several new laptop purchases were approved, Tom is ordering. | |||
== replacements for 2014 == | == replacements for 2014 == |
Revision as of 15:59, 11 March 2015
We aim to "evergreen" our laptops by replacing 1/3 of them every year, meaning none should usually be older than 3 years.
ongoing log
2015-03-05 Tom has ordered 3 and asked Randy to order 3 as well.
2015-03-02 rubber Dells are painfully slow now w windows; getting quote for early replacement for steering from Tom
2015-01-19 the next bunch of laptops to replace are: (2 more Aug and Nov 2016) GRA_MICU GHDW210X36XDVW1 GRA_MICU 36XDVW1 11-Mar-2013 03-Mar-2016 Yes HSC_D4 HSGF216XJ5XDVW1 (?) HSC H4? J5XDVW1 11-Mar-2013 03-Mar-2016 No VIC_S5 VGDATACOG5XDVW1 VIC_S5 G5XDVW1 11-Mar-2013 03-Mar-2016 Yes GRA_N5 GHDW210XH5XDVW1 GRA_N5 H5XDVW1 11-Mar-2013 03-Mar-2016 Yes GRA_N3 GHDW210X16XDVW1 GRA_N3 16XDVW1 11-Mar-2013 03-Mar-2016 Yes VIC_S4 VGDATACO26XDVW1 (?) may have been VicS4S3 26XDVW1 11-Mar-2013 03-Mar-2016 No
2015-01-15 emailed Brandon to see if he still wants to do testing or I can roll out…
2014-12-22 Brandon Deamel seems to want to test something so leaving at my desk for now. Snooze to Jan to hear back from him.
2014-12-15 Turns out it was being set up at HSC instead; done and at my desk now Conc laptop is being set up at Conc, by Lloyd Flores emailed Brian Fraser to please image these here so I can test and finish setup before traveling to site
2014-12-11ish … inc 864997
2014-12-10 Tom emailed that one Medicine laptop is available now; asked if it had to be med and when the other two would be here. 2 need to go to StB better to make it one trip.
2014-12-08 Tom says Randy has the forms… asked about follow up
2014-12-01 FU email to Tom re. extra laptop
2014-11-20 found out that I missed one of the STB laptops; asked Tom to order. Also talking with eHealth about the remaining non-W7 laptops deployed Lorri’s PC.
2014-11-12 confirmed working; emailed Lorri Pruden for setup time
2014-11-06 set up ccmdb starter w network fix copy desktop confirm laptop setup
2014/Nov/3 got the two laptops, setting Laura’s up now, booked to deliver Thursday
2014/Oct/29 laptops are here, John Stewart is setting them up; being set up for Oaks and StB Laura
2014/Oct/06 emailed Brian for follow-up; OOO back Oct 20
2014/Sep/18 emailed Tom again; Brian Fraser emailed back, request has just gone to finance
2014/Sep/08 Tom replied that he will fu
2014/Sep/04 emailed Tom for update
2014/Aug/18 several new laptop purchases were approved, Tom is ordering.
replacements for 2014
Laptops planned to be replaced this year are in workstations.mdb. The following 5 have warranty that expires June 4 and are our highest priority:
- OAK_MICU
- HSC_B3
- STB_CCU
- STB_E6
- HSC_SICU
Email Tom Fraser March 7, we are replacing 5. Email Tom March 24ish, they have been ordered.
exception 2013
In 2013 we could not get a new model tested, so we decided to extend warranty for one year for the oldest laptops. They will be replaced in 2014.