Courier: Difference between revisions

 
(One intermediate revision by the same user not shown)
Line 12: Line 12:
===HSC/Grace===
===HSC/Grace===
*Sending OUT forms to Grace from HSC:  large envelopes or packages '''must put cost center''' on package
*Sending OUT forms to Grace from HSC:  large envelopes or packages '''must put cost center''' on package
{{discuss |
* now that we have transitioned to TISS completion in CCMDB, and we no longer have log sheets or green sheets, this is no longer an issue.
* Would that make it cheaper to just print things at GRA as required, especially since printer project means we no longer pay wear and tear or toner? Ttenbergen 10:49, 2020 September 23 (CDT)
}}
 
{{discuss | This is inconsistent with the GRA instruction below where it says no cost centre required. }}
 
*Sending IN forms from GRACE to HSC - ''no charges and no cost center'' need on envelope.


==Contact instructions==
==Contact instructions==
Line 28: Line 22:
We have pre-made labels:
We have pre-made labels:
*To all site except STB: on the top right of envelope, we write the cost center to charge to.
*To all site except STB: on the top right of envelope, we write the cost center to charge to.
*for STB: top right of envelope we write interhospital  
*for STB: top right of envelope we write interhospital
{{Discuss | this needs to be made consistent with what is written above. actually, should there even be two sections of instructions or just one? Ttenbergen
}}


===GRA===
===GRA===