Query check CCI Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) changed from Arrive DtTm to Accept DtTm |
Ttenbergen (talk | contribs) m →Log |
||
Line 18: | Line 18: | ||
== Log == | == Log == | ||
* 2021-01-20 - confirmed that both dates before admit and after dispo are caught. | |||
* 2020-10-15 - changed start limit from [[Arrive DtTm]] to [[Accept DtTm]] since we now collect data on pts starting at ER arrival, and the EMIP distinction is going away. | * 2020-10-15 - changed start limit from [[Arrive DtTm]] to [[Accept DtTm]] since we now collect data on pts starting at ER arrival, and the EMIP distinction is going away. | ||
Revision as of 20:39, 20 January 2021
Data Integrity Checks | |
Summary: | Px Date must be sensible when compared to Accept_DtTm and Dispo_DtTm |
Related: | Px Date, Accept_DtTm, Dispo_DtTm, Px Type |
Firmness: | hard check |
Timing: | complete |
App: | CCMDB.accdb |
Coding: | query check_CCI_Date |
Uses L Problem table: | not relevant for this app |
Status: | implemented |
Implementation Date: | 2018-10-14 |
Backlogged: | true |
If this check changes, consider whether Query check ICD10 date should be changed the same way.
- If exists, Px_Date must be between Accept_DtTm and Dispo_DtTm
- Px_Date mandatory for procedures with Px Type acquired / Acquired Procedure
- Px_Date not allowed for procedures with Px Type admit / Admit Procedure
Log
- 2021-01-20 - confirmed that both dates before admit and after dispo are caught.
- 2020-10-15 - changed start limit from Arrive DtTm to Accept DtTm since we now collect data on pts starting at ER arrival, and the EMIP distinction is going away.
Related Articles
Related articles: |