Overstay Project Start Stop dates: Difference between revisions

From CCMDB Wiki
Jump to navigation Jump to search
TOstryzniuk (talk | contribs)
m TOstryzniuk moved page Overstay Project Start end dates to Overstay Project Start Stop dates without leaving a redirect: minor
TOstryzniuk (talk | contribs)
m minor
Line 2: Line 2:
#'''HSC'''  
#'''HSC'''  
#*B3, H4, H4H, A4, D4, D5: '''November 5, 2015'''
#*B3, H4, H4H, A4, D4, D5: '''November 5, 2015'''
 
#**stopped DPST form, putting dots on charts & filling in transition coordinator binder.
#**CONTINUED to: generated a color


===Start Date ===
===Start Date ===
Line 16: Line 17:
#*E6: '''November 13, 2012''' (Training starting the week of October 2012 29th
#*E6: '''November 13, 2012''' (Training starting the week of October 2012 29th
#*E5: '''November 5, 2012''' (Training starting in October 23th and 24th 2012). Database study number 91429.
#*E5: '''November 5, 2012''' (Training starting in October 23th and 24th 2012). Database study number 91429.
 
#**ward stopped filling in DPST forms between Oct 9-23.16 for local site "experiment" using an Emergency safety checklist form.
=== End Date ===
=== End Date ===
There is no end date for the project at present.
There is no end date for the project at present.

Revision as of 16:11, 20 October 2016

Stop Date

  1. HSC
    • B3, H4, H4H, A4, D4, D5: November 5, 2015
      • stopped DPST form, putting dots on charts & filling in transition coordinator binder.
      • CONTINUED to: generated a color

Start Date

  1. HSC
    • B3, H4, H4H, A4, D4, D5: May 13, 2013
  2. VIC
    • S3, S4, N5, S5 AND the overflow beds February 11, 2013
  3. GRA
    • N3, W3: October 1, 2012
    • N5: July 23, 2012
  4. STB
    • 5B: November 19, 2012 (Training starting in November 5th 2012)
    • E6: November 13, 2012 (Training starting the week of October 2012 29th
    • E5: November 5, 2012 (Training starting in October 23th and 24th 2012). Database study number 91429.
      • ward stopped filling in DPST forms between Oct 9-23.16 for local site "experiment" using an Emergency safety checklist form.

End Date

There is no end date for the project at present.