HSC D5: Difference between revisions

TOstryzniuk (talk | contribs)
mNo edit summary
TOstryzniuk (talk | contribs)
Line 19: Line 19:
*Renovations estimate time frame 12-18 months.  
*Renovations estimate time frame 12-18 months.  
*Manager hopes 6 patients will be decanted to B2 beds during such time rather than H7 (old CCU).  
*Manager hopes 6 patients will be decanted to B2 beds during such time rather than H7 (old CCU).  
*(H7) will be used for contingency beds after [[HSC_CAU]] moves to B2 on April 18.18
*(H7) will be used for '''contingency beds''' after [[HSC_CAU]] moves to B2 on April 18.18
{{Discussion}} - contingency beds for CAU?
*D5 patients on B2 would be considered "off-ward" as our non-teaching medicine patients are on RR5 and RR6.--[[User:Llemoine|Llemoine]] 13:07, 2018 April 4 (CDT)
*D5 patients on B2 would be considered "off-ward" as our non-teaching medicine patients are on RR5 and RR6.--[[User:Llemoine|Llemoine]] 13:07, 2018 April 4 (CDT)