Px Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) m |
Ttenbergen (talk | contribs) m cat |
||
Line 8: | Line 8: | ||
|created_raw=Raw | |created_raw=Raw | ||
|data_element_sort_index=4 | |data_element_sort_index=4 | ||
|element_description=The date/time of a [[CCI]] | |element_description=The date/time of a [[CCI]] procedure | ||
}} | }} | ||
The Px Date is coded as part of the [[CCI | The Px Date is coded as part of the [[CCI collection]]. | ||
This is only collected for '''acquired''' procedures, not admits. | This is only collected for '''acquired''' procedures, not admits. | ||
[[Category: ICD10/CCI Conversion]] | |||
[[Category: CCI]] |
Revision as of 16:59, 2017 September 21
Data Element (edit) | |
Field Name: | Px Date |
CCMDB Label: | not stated |
CCMDB tab: | not stated |
Table: | L CCI table |
Data type: | date/time"date/time" is not in the list (number, integer, long, boolean, string, memo, date, not entered) of allowed values for the "FieldDataType" property. |
Length: | |
Program: | Med and CC |
Created/Raw: | Raw |
Start Date: | 1988-07-11 |
End Date: | 2300-01-01 |
Sort Index: | 4 |
The date/time of a CCI procedure
The Px Date is coded as part of the CCI collection.
This is only collected for acquired procedures, not admits.