Evergreening of data collector laptops

From CCMDB Wiki
Revision as of 14:51, 2016 November 28 by Ttenbergen (talk | contribs) (→‎2016-12 HSC_A4: log)
Jump to navigation Jump to search

We aim to "evergreen" our laptops by replacing 1/3 of them every year, meaning none should usually be older than 3 years. See workstations.mdb for current laptops and PCs.

Currently some icu laptops are used by med collectors and vice versa. When odering, let Tom figure out which one he is replacing rather than relying on our tracking of Med vs ICU.

ongoing log

2016-12 HSC_A4

  • 14:51, 2016 November 28 (CST) The laptop arrived nov 10 and is stuck in desktop
  • 16:15, 2016 November 9 (CST) emailed Tom because Trish had an email about lease return of the H4 laptop
  • 13:15, 2016 October 31 (CDT) Tom called, the laptop will be paid for by CC (only for Tom's record keeping).
  • Tom replied that he won't order until later this week since we can't get new till lease expires. Ttenbergen 16:37, 2016 October 17 (CDT)
  • emailed Brian for update Ttenbergen 10:23, 2016 October 17 (CDT)
  • emailed Tom for update Ttenbergen 10:57, 2016 October 6 (CDT)

2016-08 HSC_H4 - done

  • Laptop was deployed 2016-10-27
  • laptop has arrived and will move over to Brian's group today or tomorrow. Ttenbergen 16:37, 2016 October 17 (CDT)
  • emailed Brian for update Ttenbergen 10:23, 2016 October 17 (CDT)
  • emailed Tom for update Ttenbergen 10:57, 2016 October 6 (CDT)

2016-12 laptop replacement

Con's laptop... confirmed today that warranty expires on Dec 1. Asked Tom to start order Ttenbergen 10:49, 2016 September 22 (CDT)

2016-08 HSC laptop replacement

PO180772 PO88133 INC000002437718 - closed, was just for the quote

  • the new laptop arrived but was needed for dept emergency, Tom is ordering a new one. Ttenbergen 11:53, 2016 September 22 (CDT)
  • asked Tom for status since there might be an issue with Con's laptop... Ttenbergen 10:49, 2016 September 22 (CDT)
  • Tom got note from vendor, not available till after Sept 13, set reminder Ttenbergen 11:12, 2016 August 31 (CDT)
  • FU email to Tom Ttenbergen 18:13, 2016 August 25 (CDT)
  • "I'm ordering this right now Kathy will sign off next week then it goes to purchasing to sign off-Tom" Ttenbergen 16:33, 2016 August 11 (CDT)
  • Tom waiting for quote for PO88133 Ttenbergen 10:15, 2016 August 11 (CDT)
  • follow up email to Tom Ttenbergen 10:02, 2016 August 11 (CDT)
  • emailed Tom with request to order. Ttenbergen 10:11, 2016 July 28 (CDT)

2015-05-28

no further new laptops required until Aug 2016. setting reminder for mid July to order. Ttenbergen 13:19, 2015 May 28 (CDT)

2015-04-28

  • emailed Paul Linton re EPR access for *34S; he as confirmed that it's on EPR list and suggested I launch desktop ticket, which I did
  • gave Con *QYJ laptop for HSC_MICU, since *34S doesn't have EPR access yet
  • Deployed last laptop at Vic, there were some problems with wireless and EPR (for michelle only), launched incident 998372.
  • Kendall launched ticket to add new laptops to EPR and Wireless... no date yet

2015-04-20

  • emailed to Jared Thompson re. last HSC laptop, looks like one Inc just got closed Ttenbergen 15:51, 2015 April 20 (CDT)
    • emailed Tom and Raymund about last HSC laptop: Inc 976441 Ttenbergen 15:27, 2015 April 20 (CDT)
  • emailed Kendall and Pierre again Ttenbergen 15:27, 2015 April 20 (CDT)
  • emailed helpdesk to get EPR set up for this laptop Ttenbergen 15:27, 2015 April 20 (CDT)
  • set up the laptop that was supposed to be new HSC ICU as HSC MICU because that laptop was causing problems.

2015-04-16

we have one more laptop that has arrived, it will be the new HSC MICU one... installed HSC_D4 for Judith

2015-04-15

picked up imaged HSC laptops, requested adding new one to EPR. Requested replacing D4 one in EPR (Inc 982956).

2015-04-14

Pierre from Vic called told me this has arrived and whether there are any curve balls.

2015-04-13

  • Inc 976694 HSC 1x (done)
  • Inc 976588 GGH 3x
  • Inc 976612 VGH 1x

2015-04-08

the other 5+1 have arrived emailed Tom re ETA for the 5+1 ICU laptops STB laptop was rolled out last week, the two VIC laptops were set up this morning. The HSC laptop is mostly set up but we decided to use it for the new ICU person and set up the new ones as A4 replacement when ready.

2015-03-26 4 medicine laptops have arrived. Tom confirmed he is ordering 6+3 but as 4med+5ICU for accounting reasons. He is also ordering one extra for new HSC ICU Emailed Tom to confirm he got count correction from 2015-03-05

2015-03-05 Tom has ordered 3 and asked Randy to order 3 as well. Found mistake in counts, need 5 Med and 6 ICU. originally asked for 3 and 3.

2015-03-02 rubber Dells are painfully slow now w windows; getting quote for early replacement for steering from Tom

2015-01-19 the next bunch of laptops to replace are: (2 more Aug and Nov 2016)

  • GRA_MICU GHDW210X36XDVW1 GRA_MICU 36XDVW1 11-Mar-2013 03-Mar-2016 Yes
  • HSC_D4 HSGF216XJ5XDVW1 (?) HSC H4? J5XDVW1 11-Mar-2013 03-Mar-2016 No
  • VIC_S5 VGDATACOG5XDVW1 VIC_S5 G5XDVW1 11-Mar-2013 03-Mar-2016 Yes
  • GRA_N5 GHDW210XH5XDVW1 GRA_N5 H5XDVW1 11-Mar-2013 03-Mar-2016 Yes
  • GRA_N3 GHDW210X16XDVW1 GRA_N3 16XDVW1 11-Mar-2013 03-Mar-2016 Yes
  • VIC_S4 VGDATACO26XDVW1 (?) may have been VicS4S3 26XDVW1 11-Mar-2013 03-Mar-2016 No

2015-01-15 emailed Brandon to see if he still wants to do testing or I can roll out…

2014-12-22 Brandon Deamel seems to want to test something so leaving at my desk for now. Snooze to Jan to hear back from him.

2014-12-15 Turns out it was being set up at HSC instead; done and at my desk now Conc laptop is being set up at Conc, by Lloyd Flores emailed Brian Fraser to please image these here so I can test and finish setup before traveling to site

2014-12-11ish … inc 864997

2014-12-10 Tom emailed that one Medicine laptop is available now; asked if it had to be med and when the other two would be here. 2 need to go to StB better to make it one trip.

2014-12-08 Tom says Randy has the forms… asked about follow up

2014-12-01 FU email to Tom re. extra laptop

2014-11-20 found out that I missed one of the STB laptops; asked Tom to order. Also talking with eHealth about the remaining non-W7 laptops deployed Lorri’s PC.

2014-11-12 confirmed working; emailed Lorri Pruden for setup time

2014-11-06 set up ccmdb starter w network fix copy desktop confirm laptop setup

2014/Nov/3 got the two laptops, setting Laura’s up now, booked to deliver Thursday

2014/Oct/29 laptops are here, John Stewart is setting them up; being set up for Oaks and StB Laura

2014/Oct/06 emailed Brian for follow-up; OOO back Oct 20

2014/Sep/18 emailed Tom again; Brian Fraser emailed back, request has just gone to finance

2014/Sep/08 Tom replied that he will fu

2014/Sep/04 emailed Tom for update

2014/Aug/18 several new laptop purchases were approved, Tom is ordering.