Also referred to as update query
Update queries make bulk changes to data based on a set of criteria. (Unlike Select queries that just show the data.)


This article explains how to write a bulk update query to a data field using Access in centralized front end ([[CFE]]).
This article explains how to write a update query, e.g. in [[CFE]].


The steps below use one example to demonstrate how to replace a specific item in a data field with another.
The steps below use one example to demonstrate how to replace a specific item in a data field with another.


Example below:
Example for demonstration of steps below:
*in the "R_dc_treat" field in "L_log", there are erroneous values of "-1" however, all of these values must be replace with the value "DC".
*in the "R_dc_treat" field in "L_log", there are erroneous values of "-1" however, all of these values must be replace with the value "DC".
Steps broken down into 4 parts
Steps broken down into 4 parts
Line 20: Line 20:
**Scroll down and find '''R_dc_treat'''.  
**Scroll down and find '''R_dc_treat'''.  
**Double click on '''R_dc_treat''' TWICE
**Double click on '''R_dc_treat''' TWICE
**You should see R_dc_treat in two columns in the FIELD box.
***You should see R_dc_treat in two columns in the FIELD box.
**in the first column in the CRITERIA field, enter: "-1"
**in the first column in the CRITERIA field, enter: "-1"
**In the SECOND column, change to field name to the following: '''NewValue:"DC" '''
**In the SECOND column, change to field name to the following: '''NewValue:"DC" '''
Line 28: Line 28:


==Part 2==
==Part 2==
Change this from a Selection Query to and '''Append Query''' that will actually prepare you to make change you set up after you run it. See Picture [[Media:Update query Part 2.JPG | Setting up Append Query Part 2-4]]
Change this from a Selection Query to and '''Update Query''' that will actually prepare you to make change you set up after you run it. See Picture [[Media:Update query Part 2.JPG | Setting up Update Query Part 2-4]]
**Go to TAB at top of screen: Query Tools - Design
*Go to TAB at top of screen: Query Tools - Design
**Select and SAVE as : Query Type - '''APPEND'''
*Select and SAVE as : Query Type - '''APPEND'''
***notice that the symbol beside the query you named will be different.  
***notice that the symbol beside the query you named will be different.  
***notice that the row that was labelled sort has now changed to: '''Update to'''.
***notice that the row that was labelled '''sort''' has now changed to: '''Update to'''.


==Part 3==
==Part 3==
*in the first column in the '''Update to''' field, type in: "DC"
*in the first column in the '''Update to''' field, type in: "DC"
*in the second column, first row called Field, remove the whole field: NewValue:"DC"
*in the second column, first row called Field, remove the entry from the whole field: NewValue:"DC"
*SAVE again as a APPEND - query type.
*SAVE again as a APPEND - query type.


==Part 4-Ready to change data==
==Part 4-Ready to change data==
Press the red ! run button.  
Press the red ! run button.  
*query has done it job.
*query has done it's job.
   
   



Latest revision as of 15:42, 2017 September 20

Update queries make bulk changes to data based on a set of criteria. (Unlike Select queries that just show the data.)

This article explains how to write a update query, e.g. in CFE.

The steps below use one example to demonstrate how to replace a specific item in a data field with another.

Example for demonstration of steps below:

  • in the "R_dc_treat" field in "L_log", there are erroneous values of "-1" however, all of these values must be replace with the value "DC".

Steps broken down into 4 parts

Part 1

Set up a Selection Query. See Picture: Part 1 setting up update query

  • this allows you to look if the update you're are planning is going to do what you need it to do before you actually proceed to part 2.
  • Open CFE
  • in the tool bar select the following:
    • CREATE
    • Select: Query Design. A list of tables will appear
    • Select: L_Log
    • Close the table box
    • Scroll down and find R_dc_treat.
    • Double click on R_dc_treat TWICE
      • You should see R_dc_treat in two columns in the FIELD box.
    • in the first column in the CRITERIA field, enter: "-1"
    • In the SECOND column, change to field name to the following: NewValue:"DC"
    • Select DATASHEET VIEW. You will see in your first column what the value currently is and in the second column, what the value will be replaced with.
    • SAVE with a intuitive name of what this update query will do.
    • Go back to DESIGN VIEW. Make any changes if needed.

Part 2

Change this from a Selection Query to and Update Query that will actually prepare you to make change you set up after you run it. See Picture Setting up Update Query Part 2-4

  • Go to TAB at top of screen: Query Tools - Design
  • Select and SAVE as : Query Type - APPEND
      • notice that the symbol beside the query you named will be different.
      • notice that the row that was labelled sort has now changed to: Update to.

Part 3

  • in the first column in the Update to field, type in: "DC"
  • in the second column, first row called Field, remove the entry from the whole field: NewValue:"DC"
  • SAVE again as a APPEND - query type.

Part 4-Ready to change data

Press the red ! run button.

  • query has done it's job.