Reconnect CFE and initial error checks: Difference between revisions

From CCMDB Wiki
Jump to navigation Jump to search
PTorres (talk | contribs)
PTorres (talk | contribs)
Line 3: Line 3:
== Instructions ==
== Instructions ==
* Click the "Re-connect Data" button
* Click the "Re-connect Data" button
* Screen prompt 'do you have recent TISS', answer '''YES'''
* Screen prompt 'Could not find file ... DSM...', answer '''YES'''
{{DT | remove msgbox, this is now copied by script so should be right. }}
{{DT | Fix why it gives this error as part of fixing DSM process. }}
* The program will now resetthe connections from [[CFE]] to [[Centralized data.mdb]], [[PHI.mdb]] and [[TISS28 Data.mdb]]
* The program will now reset the connections from [[CFE]] to [[Centralized data.mdb]], [[PHI.mdb]] and [[TISS28 Data.mdb]]
* the reconnector will confirm if [[L_Log table]] and [[L_PHI table]] have the same records in them. If they don't there will be an error; see [[Procedure when there are differences between L Log and L PHI]] for how to proceed
* the reconnector will confirm if [[L_Log table]] and [[L_PHI table]] have the same records in them. If they don't there will be an error; see [[Procedure when there are differences between L Log and L PHI]] for how to proceed
* Run initial cross checks:  
* Run initial cross checks:  
** [[PL_1orphans]]- see [[Orphans in Centralized data.mdb]] for what to do about these.  
** [[PL_1orphans]]- see [[Orphans in Centralized data.mdb]] for what to do about these.  
** [[PL missing L Tables content]]  
** [[PL missing L Tables content]]  
{{Discuss | who = Pagasa | question =  need to say what we do... }}
*** for now there are some CCIs on this list. Tina will fix [[Query check CCI must have entry]] so those are caught going forward.
 
*** Generally, errors in missing need to be resolved by [[Re-sending data]] because usually caused by a failed send.
 
{{DT | re-name these so not PL any more }}
{{DT | re-name these so not PL any more }}
* Continue what you were doing, likely the next step of [[Centralized data Vetting Process]]:  [[Pre-linking checks]]
* Continue what you were doing, likely the next step of [[Centralized data Vetting Process]]:  [[Pre-linking checks]]

Revision as of 09:46, 7 February 2019

Once you "Pull" Centralized data.mdb you need to initialise the program and make sure that you have consistent initial data.

Instructions

  • Click the "Re-connect Data" button
  • Screen prompt 'Could not find file ... DSM...', answer YES

Fix why it gives this error as part of fixing DSM process.

  • SMW


  • Cargo


  • Categories

re-name these so not PL any more

  • SMW


  • Cargo


  • Categories

Related articles

Related articles: