Px Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) m cat |
Ttenbergen (talk | contribs) m m |
||
Line 2: | Line 2: | ||
|field_name=Px Date | |field_name=Px Date | ||
|Rank=N/A | |Rank=N/A | ||
|in_table= | |in_table=L_CCI table | ||
|data_type=date | |data_type=date | ||
|datafield_length= | |datafield_length= | ||
|program_collecting=Med and CC | |program_collecting=Med and CC |
Revision as of 17:00, 2017 September 21
Data Element (edit) | |
Field Name: | Px Date |
CCMDB Label: | not stated |
CCMDB tab: | not stated |
Table: | L_CCI table |
Data type: | date |
Length: | |
Program: | Med and CC |
Created/Raw: | Raw |
Start Date: | 1988-07-11 |
End Date: | 2300-01-01 |
Sort Index: | 4 |
The date/time of a CCI procedure
The Px Date is coded as part of the CCI collection.
This is only collected for acquired procedures, not admits.