Template:CCI collect count days: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) m Ttenbergen moved page CCI collect count days to Template:CCI collect count days: needs to be template to be called easily, but needs to be page to be referred to easily by SMW, so moving with redirect |
Ttenbergen (talk | contribs) mNo edit summary |
||
(16 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
<noinclude>This page gives instructions for [[CCI Collection]] for {{PAGENAME}} items. | <noinclude>This page gives instructions for [[CCI Collection]] for [[CCI Collection Mode]] - {{PAGENAME}} items. | ||
[[Category:CCI wiki infrastructure]][[Category:CCI]] | [[Category:CCI wiki infrastructure]][[Category:CCI]] | ||
</noinclude>===Collecting "CCI collect count days" items=== | </noinclude>===Collecting "CCI collect count days" items=== | ||
* "CCI collect count days" items are entered as '''counts of how often they occurred''' | * "CCI collect count days" items are entered as '''counts of how often they occurred''' | ||
* enter the [[Px Date]] of the '''first time they happen''' | * [[Px Date]] | ||
* enter the total number of '''days''' on which the procedure was done, even just for part of the day, | ** if an [[Acquired Procedure]], enter the [[Px Date]] of the '''first time they happen''' | ||
** if an [[Admit Procedure]] leave the date blank | |||
* enter the total number of '''days''' on which the procedure was done, even just for part of the day, [[Admit Procedure]] and each [[Acquired Procedure]] of this type '''as [[Px Count]]''' | |||
* this data is cross-checked by [[query check_CCI_vs_LOS_count_days_component]] and [[query check_CCI_vs_LOS_count_days_picklist]] |
Latest revision as of 15:45, 2022 February 10
This page gives instructions for CCI Collection for CCI Collection Mode - CCI collect count days items.
Collecting "CCI collect count days" items
- "CCI collect count days" items are entered as counts of how often they occurred
- Px Date
- if an Acquired Procedure, enter the Px Date of the first time they happen
- if an Admit Procedure leave the date blank
- enter the total number of days on which the procedure was done, even just for part of the day, Admit Procedure and each Acquired Procedure of this type as Px Count
- this data is cross-checked by query check_CCI_vs_LOS_count_days_component and query check_CCI_vs_LOS_count_days_picklist