*Start date:  '''2014-Nov-17''' {{discussion}} is this date correct? --[[User:JMojica|JMojica]] 09:09, 2018 March 14 (CDT)
*Start date:  '''2014-Nov-17''' {{discussion}} is this date correct? --[[User:JMojica|JMojica]] 09:09, 2018 March 14 (CDT)
*Name change from CCDU to CAU:  '''2017-Oct-03'''  
*Name change from CCDU to CAU:  '''2017-Oct-03'''  
*Physical Location: GH7  (H7A on [[EPR]]) '''2017-Nov-17'''   
*Physical Location: GB-2late April 2018
*Physical Location: GB2 April 18th/2018'''''-will be staffed for 10 beds with 7 contingency/flex beds- (Addictions, moved to RR2): mostly ER delayed D/Cs with criteria "
**(Previously was on:  GH7  (H7A on [[EPR]]) '''2017-Nov-17 - 2018-Apr.'''   
*Number of beds: '''10'''
*Number of beds: '''10'''
**2 flex beds (over census)in spring 2018.   
**2 flex beds (over census)in spring 2018.   
* Manager: '''Sheresse Weekes'''
* Manager: '''Sheresse Weekes'''
**also manager of: [[HSC_D5]]
**also manager of: [[HSC_D5]]
* Director: Dr. Manon Pelletier: CAU on H7/B2
* Director: Dr. Manon Pelletier: CAU B2
**CBA(VIC) taking mostly from Grace ER to decant as they are still under renos.--[[User:Llemoine|Llemoine]] 07:45, 2018 March 28 (CDT)
**CBA(VIC) taking mostly from Grace ER to decant as they are still under renos.--[[User:Llemoine|Llemoine]] 07:45, 2018 March 28 (CDT)
***D5 ward will be under renovations beginning tentatively between June and September/2018. Renovations estimate time frame 12-18 months. Manager hopes 6 patients will be decanted to B2 beds during such time rather than H7 (old CCU). This area (H7) will be used for contingency beds after CAU moves to B2. D5 patients on B2 would be considered "off-ward" as our non-teaching medicine patients are on RR5 and RR6.--[[User:Llemoine|Llemoine]] 13:07, 2018 April 4 (CDT)
***D5 ward will be under renovations beginning tentatively between June and September/2018. Renovations estimate time frame 12-18 months. Manager hopes 6 patients will be decanted to B2 beds during such time rather than H7 (old CCU). This area (H7) will be used for contingency beds after CAU moves to B2. D5 patients on B2 would be considered "off-ward" as our non-teaching medicine patients are on RR5 and RR6.--[[User:Llemoine|Llemoine]] 13:07, 2018 April 4 (CDT)

Revision as of 12:43, 2018 April 23

HSC CAU is the Clinical Assessment Unit at HSC (further info on CAUs).

HSC Specific CAU Information

At HSC the CAU is considered part of the Emergency Department. Expected changes in 2018

Collection instructions

If a patient is admitted from HSC CAU: (further changes in progress)

HSC CAU Details

  • Start date: 2014-Nov-17 Template:Discussion is this date correct? --JMojica 09:09, 2018 March 14 (CDT)
  • Name change from CCDU to CAU: 2017-Oct-03
  • Physical Location: GB-2late April 2018
    • (Previously was on: GH7 (H7A on EPR) 2017-Nov-17 - 2018-Apr.
  • Number of beds: 10
    • 2 flex beds (over census)in spring 2018.
  • Manager: Sheresse Weekes
  • Director: Dr. Manon Pelletier: CAU B2
    • CBA(VIC) taking mostly from Grace ER to decant as they are still under renos.--Llemoine 07:45, 2018 March 28 (CDT)
      • D5 ward will be under renovations beginning tentatively between June and September/2018. Renovations estimate time frame 12-18 months. Manager hopes 6 patients will be decanted to B2 beds during such time rather than H7 (old CCU). This area (H7) will be used for contingency beds after CAU moves to B2. D5 patients on B2 would be considered "off-ward" as our non-teaching medicine patients are on RR5 and RR6.--Llemoine 13:07, 2018 April 4 (CDT)

Legacy

Used to be called HSC Community and Clinical Decision Unit (CCDU) / Clinical Assessment Unit (CDU)

Had people on H7 location since 2016-December.