LAU OT/PT consults: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) No edit summary |
Ttenbergen (talk | contribs) m Text replacement - "|ProjectCollectionStartDate=Whenever LAU Collection Project starts↵|ProjectCollectionStopDate=Whenever LAU Collection Project is done" to "|ProjectCollectionStartDate={{LAU Collection StartDt}} |ProjectCollectionStopDate={{LAU Collection EndDt}}" |
||
Line 2: | Line 2: | ||
|ProjectActive=planned | |ProjectActive=planned | ||
|ProjectRequestor=Dr. Nick Hajidiacos | |ProjectRequestor=Dr. Nick Hajidiacos | ||
|ProjectCollectionStartDate= | |ProjectCollectionStartDate={{LAU Collection StartDt}} | ||
|ProjectCollectionStopDate= | |ProjectCollectionStopDate={{LAU Collection EndDt}} | ||
|Project={{PAGENAME}} | |Project={{PAGENAME}} | ||
}} | }} |
Latest revision as of 12:00, 18 March 2025
Projects | |
Active?: | planned |
Program: | |
Requestor: | Dr. Nick Hajidiacos |
Collection start: | 2025-03-15 |
Collection end: | Whenever LAU Collection Project is done "Whenever LAU Collection Project is done" contains an extrinsic dash or other characters that are invalid for a date interpretation. |
This dataset contains data in support of the LAU Collection Project.
The date/time that OT and PT are consulted and the date/time they sign off or discharged from OT/PT
Data Collection
- For any record collected as part of LAU Collection Project, enter the date and time of the first OT and PT consult and the date and time of the last sign-off/discharge from OT/PT
Data Entry Instructions
For every LAU Collection Project, one line with Project = "OTPT Consults" and item = "not entered" will automatically be entered. Update that line to one of the following:
- Project: OTPT Consults - Item: "OT First"
- Project: OTPT Consults - Item: "PT First"
- Project: OTPT Consults - Item: "OT Last"
- Project: OTPT Consults - Item: "PT Last"
- Project: OTPT Consults - Item: "no consult" (cross-check item if there were no consults)
- Date/Time:
- dttm of the consult
- first Service tmp entry for first consult if pt arrived with a consult in progress
![]() |
|
- Checkbox, Integer, Real, Comment: not used
Sources
- Orders
- consult section
- progress notes
- EPR ER notes/documents
Data Use
This data is being collected as a current state for LAU Collection Project.
Data Integrity Checks (automatic list)
none found
Background
- When we realized we would do Project Consults data we contacted Nick whether we want additional consults, and possibly for other than LAU.
- he would like OT/PT first consult and when they sign off Lisa Kaita 21:03, 10 March 2025 (CDT)
- decision made to break out the LAU OT/PT consults to a separate project
- considered and decided that we will not include SLP, mostly so we can get started with the project rather get delayed further waiting for an answer
Related articles
Related articles: |