Query check CCI Date
Data Integrity Checks | |
Summary: | Px Date must be sensible when compared to first Service tmp entry and Dispo_DtTm |
Related: | Px Date, Service tmp entry, Dispo_DtTm, Px Type |
Firmness: | hard check |
Timing: | complete |
App: | CCMDB.accdb |
Coding: | query check_CCI_Date |
Uses L Problem table: | not relevant for this app |
Status: | implemented |
Implementation Date: | 2018-10-14 |
Backlogged: | true |
If this check changes, consider whether Query check ICD10 date should be changed the same way.
- If exists, Px_Date must be between first Service tmp entry and Dispo_DtTm
- Px_Date mandatory for procedures with Px Type acquired / Acquired Procedure
- Px_Date not allowed for procedures with Px Type admit / Admit Procedure
Log
- 2022-03-31 - updated to use first Service tmp entry instead of "Accept DtTm"
- 2021-03-24 - Julie flagged a false negative that was probably from before the last log
- 2021-01-20 - confirmed that both dates before admit and after dispo are caught.
- 2020-10-15 - changed start limit from "Arrive DtTm" to "Accept DtTm" since we now collect data on pts starting at ER arrival, and the EMIP distinction is going away.
Related Articles
Related articles: |