Query check CCI Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) mNo edit summary |
Ttenbergen (talk | contribs) m Text replacement - "| DIC_app" to "| DIC_timing = complete always | DIC_app" |
||
Line 3: | Line 3: | ||
| DIC_related_concepts = [[Px Date]], [[Arrive_DtTm]], [[Dispo_DtTm]] | | DIC_related_concepts = [[Px Date]], [[Arrive_DtTm]], [[Dispo_DtTm]] | ||
| DIC_firmness = hard check | | DIC_firmness = hard check | ||
| DIC_timing = complete always | |||
| DIC_app = CCMDB.mdb | | DIC_app = CCMDB.mdb | ||
| DIC_coding = | | DIC_coding = |
Revision as of 12:56, 25 September 2018
Data Integrity Checks | |
Summary: | Px Date must be sensible when compared to Arrive_DtTm and Dispo_DtTm |
Related: | [[Px Date, Arrive_DtTm, Dispo_DtTm]] |
Firmness: | hard check |
Timing: | complete always |
App: | CCMDB.mdb |
Coding: | |
Uses L Problem table: | not relevant for this app |
Status: | needs review |
Implementation Date: | |
Backlogged: | true |
If this check changes, consider whether Dx Chronological should be changed the same way.
- If exists, Dx_Date must be between Arrive_DtTm and Dispo_DtTm
- mandatory for procedures with Px Type acquired / Acquired Procedure
- not allowed for procedures with Px Type admit / Admit Procedure
Related Articles
Related articles: |