Query check CCI Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) m Text replacement - "DIC_timing = complete always" to "DIC_timing =" |
Ttenbergen (talk | contribs) mNo edit summary |
||
| Line 21: | Line 21: | ||
[[Category: CCI]] | [[Category: CCI Px check]] | ||
Revision as of 15:28, 27 September 2018
| Data Integrity Checks | |
| Summary: | Px Date must be sensible when compared to Arrive_DtTm and Dispo_DtTm |
| Related: | [[Px Date, Arrive_DtTm, Dispo_DtTm]] |
| Firmness: | hard check |
| Timing: | |
| App: | CCMDB.mdb |
| Coding: | |
| Uses L Problem table: | not relevant for this app |
| Status: | needs review |
| Implementation Date: | |
| Backlogged: | true |
If this check changes, consider whether Dx Chronological should be changed the same way.
- If exists, Dx_Date must be between Arrive_DtTm and Dispo_DtTm
- mandatory for procedures with Px Type acquired / Acquired Procedure
- not allowed for procedures with Px Type admit / Admit Procedure