Processes around changing a PatientFollow assignment: Difference between revisions
Ttenbergen (talk | contribs) |
Ttenbergen (talk | contribs) |
||
| Line 43: | Line 43: | ||
The [[S PatientFollow distribution table]] needs to be updated to set an ending time for the earlier laptop. A new line needs to be added for the later laptop, with the same start DtTm as the end DtTm for the earlier one. | The [[S PatientFollow distribution table]] needs to be updated to set an ending time for the earlier laptop. A new line needs to be added for the later laptop, with the same start DtTm as the end DtTm for the earlier one. | ||
If more than one or two need changing, this can be confusing if done manually in the table, an easier way is to copy- | If more than one or two need changing, this can be confusing if done manually in the table, an easier way is to copy-paste the relevant cells into Excel and use it's propagating function and then paste the result. | ||
== Related articles == | == Related articles == | ||