Overstay Predictor Project: Difference between revisions

From CCMDB Wiki
Jump to navigation Jump to search
LHathout (talk | contribs)
mNo edit summary
 
(58 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Project
|ProjectActive=legacy
|ProjectProgram=Med
|ProjectRequestor=Mary Ann Lynch and Dr Eberhard Renner
|ProjectCollectionStartDate=2012-11-05
|ProjectCollectionStopDate=2019-10-01
|Project={{PAGENAME}}
}}
{{LegacyContent
|explanation= no more [[overstay]] as of October 1, 2019
|content=
'''''See [[Overstay Predictor Project Collection Instructions]] for collection instructions for this project.'''''
'''''See [[Overstay Predictor Project Collection Instructions]] for collection instructions for this project.'''''


A small number of patients overstays for a significant amount of time after they are medically ready for discharge. Though the number of patients is small, a significant proportion of bed-days is wasted in the process. We are piloting a process at the Grace where an "transition coordinator" will be assigned to patients at risk of overstaying. Whether a patient is at risk is determined by the ward nurse assessing risk factors on a form, and by an assessment algorithm that takes into account the values mentioned as mandatory above; the combination of these results in a chart being assigned a colour sticker, and the transition coordinators monitor these chart stickers.
See [[Overstay Project Start Stop dates]]
 
==Primary Investigator==
Primary Investigator: [[Dr. Dan Roberts]]
*Overstay Predictor Project for Medicine [http://ccmdb.kuality.ca/index.php/Minutes_Team_Meeting_December_5,_2011 - Dec 5.11 collection team meeting discussion item 6]
==Project Contact Person Project Coordinator== 
Linda Hathout: Phone: 391-5434 or LHathout@exchange.hsc.mb.ca
 
== Pilot Information ==
===Start Date ===
'''Grace Hospital''' 5 North '''(N5)''' start date: '''July 23rd 2012'''
???Grace Hospital N3 start date: Tentative start date September 3rd tentative. To be determined by Mary Anne Lynch
 
=== End Date ===
There is no end date for the project at present; the committee will review results after 3 months and make adjustments at that time
 
=== Transition Coordinator Assignment ===
If the patient has been designated as "red" for purposes of overstay prediction, the data collector will notify a Transition Coordinator by placing the patients name beside the transition coordinator on call for the time period of the patients admission. The transition coordinators will be assigned to cover between Friday to Monday, the next shift will go to Wednesday, the last will be Wednesday to Friday. If the designation is made after 1500 on the day of entry, the assignment will be deferred to the next day's coordinator. The rotation of Coordinators is made up of Home Care, Social Work, Physio, And OTs.  After assignment, that service is responsible for following that patient throughout their hospital stay.


[[File:Transition_coordinator.gif]]
A small number of patients overstays for a significant amount of time after they are medically ready for discharge. Though the number of patients is small, a significant proportion of bed-days is wasted in the process. The Overstay Predictor Project uses an [[Overstay Predictor Project Algorithm | algorithm]] to  that uses data collected by the Critical Care and Medicine Database to predict an overstay risk. This risk is communicated to ward staff using a red sticker on charts and a direct communication to the unit manager.


==[[Overstay Predictor Diagnosis Code Used]] ==
==Legacy==
see [[Overstay Project Start Stop dates | Implementation Dates]]


{{Data Integrity Check List|}}


== Related Articles ==
{{Related Articles}}


[[Category: OverstayProject]]
[[Category: OverstayProject]]
[[Category: All Projects]]
}}

Latest revision as of 23:48, 9 November 2024

Projects
Active?: legacy
Program: Med
Requestor: Mary Ann Lynch and Dr Eberhard Renner
Collection start: 2012-11-05
Collection end: 2019-10-01

Legacy Content

This page contains Legacy Content.
  • Explanation: no more overstay as of October 1, 2019
  • Successor: No successor was entered

Click Expand to show legacy content.

See Overstay Predictor Project Collection Instructions for collection instructions for this project.

See Overstay Project Start Stop dates

A small number of patients overstays for a significant amount of time after they are medically ready for discharge. Though the number of patients is small, a significant proportion of bed-days is wasted in the process. The Overstay Predictor Project uses an algorithm to that uses data collected by the Critical Care and Medicine Database to predict an overstay risk. This risk is communicated to ward staff using a red sticker on charts and a direct communication to the unit manager.

Legacy

see Implementation Dates

Data Integrity Checks (automatic list)

 AppStatus
Query check tmp generate allowedCCMDB.accdbimplemented
Query check overstay no colourCCMDB.accdbretired
Query check overstay pt from our medCCMDB.accdbretired
Query check overstay not enteredCCMDB.accdbretired

Related Articles

Related articles: