Query check CCI Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) mNo edit summary |
Ttenbergen (talk | contribs) mNo edit summary |
||
| Line 17: | Line 17: | ||
* not allowed for procedures with [[Px Type]] '''admit'''. | * not allowed for procedures with [[Px Type]] '''admit'''. | ||
== Related Articles == | |||
{{Related Articles}} | |||
[[Category: CCI]] | [[Category: CCI]] | ||
Revision as of 13:02, 23 August 2018
| Data Integrity Checks | |
| Summary: | Px Date must be sensible when compared to Arrive_DtTm and Dispo_DtTm |
| Related: | [[Px Date, Arrive_DtTm, Dispo_DtTm]] |
| Firmness: | hard check |
| Timing: | always |
| App: | CCMDB.mdb |
| Coding: | |
| Uses L Problem table: | not relevant for this app |
| Status: | needs review |
| Implementation Date: | |
| Backlogged: | true |
If this check changes, consider whether Dx Chronological should be changed the same way.
- If exists, Dx_Date must be between Accept_DtTm Template:Discussion or is it Arrive_DtTm? and Dispo_DtTm