Query check CCI Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) m →Log |
Ttenbergen (talk | contribs) mNo edit summary |
||
| Line 1: | Line 1: | ||
{{Data Integrity Check | {{Data Integrity Check | ||
| DIC_summary = [[Px Date]] must be sensible when compared to [[Accept_DtTm]] and [[Dispo_DtTm]] | | DIC_summary = [[Px Date]] must be sensible when compared to [[Accept_DtTm]] and [[Dispo_DtTm]] | ||
| DIC_related_concepts = Px Date; | | DIC_related_concepts = Px Date; Service tmp entry; Dispo_DtTm; Px Type | ||
| DIC_firmness = hard check | | DIC_firmness = hard check | ||
| DIC_timing = complete | | DIC_timing = complete | ||
Revision as of 12:47, 31 March 2022
| Data Integrity Checks | |
| Summary: | Px Date must be sensible when compared to Accept_DtTm and Dispo_DtTm |
| Related: | Px Date, Service tmp entry, Dispo_DtTm, Px Type |
| Firmness: | hard check |
| Timing: | complete |
| App: | CCMDB.accdb |
| Coding: | query check_CCI_Date |
| Uses L Problem table: | not relevant for this app |
| Status: | implemented |
| Implementation Date: | 2018-10-14 |
| Backlogged: | true |
If this check changes, consider whether Query check ICD10 date should be changed the same way.
- If exists, Px_Date must be between Accept_DtTm and Dispo_DtTm
- Px_Date mandatory for procedures with Px Type acquired / Acquired Procedure
- Px_Date not allowed for procedures with Px Type admit / Admit Procedure
Log
- 2022-03-31 - updated to use first Service tmp entry instead of Accept DtTm
- 2021-03-24 - Julie flagged a false negative that was probably from before the last log
- 2021-01-20 - confirmed that both dates before admit and after dispo are caught.
- 2020-10-15 - changed start limit from Arrive DtTm to Accept DtTm since we now collect data on pts starting at ER arrival, and the EMIP distinction is going away.