Px Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) mNo edit summary |
Ttenbergen (talk | contribs) mNo edit summary |
||
Line 20: | Line 20: | ||
* Summary: We now enter a time for TISS PX Date on the day a pt moves to another unit so we can identify in which unit something happened. By the same reasoning, do we also need to do this for all other Px Date entries (CCI Pick or CCI component)? [[User:Ttenbergen|Ttenbergen]] 09:38, 2021 February 4 (CST) | * Summary: We now enter a time for TISS PX Date on the day a pt moves to another unit so we can identify in which unit something happened. By the same reasoning, do we also need to do this for all other Px Date entries (CCI Pick or CCI component)? [[User:Ttenbergen|Ttenbergen]] 09:38, 2021 February 4 (CST) | ||
}} | }} | ||
== Limitations to field formatting == | |||
There have been requests to change this field so collectors don't need to actually type the punctuation components of the date and time. The time component is only needed when there is a second entry on a different unit for the same day (actually, so far it's only required for TISS, see discussion above). | |||
A field can either be set up as a date, which enables the calendar popup, or with more flexible entry filters that would not require the punctuation, but not both. We chose to set the {{PAGENAME}} up in a way that enables the pop-up calendar but requires punctuation. | |||
{{Discuss| | |||
* Would it be more valuable to not type punctuation but always have to type the date, or is it better to have to type the punctuation when a time is needed, but be able to pop-up enter the date most of the time. | |||
== Data Integrity Checks == | == Data Integrity Checks == |
Revision as of 13:37, 20 April 2021
Data Element (edit) | |
Field Name: | Px Date |
CCMDB Label: | Px Date |
CCMDB tab: | CCI |
Table: | L_CCI_Picklist table, L_CCI_Component table |
Data type: | date |
Length: | not stated |
Program: | Med and CC |
Created/Raw: | Raw |
Start Date: | 1988-07-11 |
End Date: | 2300-01-01 |
Sort Index: | 4 |
Data Dependencies(Reports/Indicators/Data Elements): | No results |
The date/time of a CCI procedure
The Px Date is coded as part of the CCI Collection.
- mandatory for procedures with Px Type acquired / Acquired Procedure
- not allowed for procedures with Px Type admit / Admit Procedure
![]() |
AJTT
|
Limitations to field formatting
There have been requests to change this field so collectors don't need to actually type the punctuation components of the date and time. The time component is only needed when there is a second entry on a different unit for the same day (actually, so far it's only required for TISS, see discussion above).
A field can either be set up as a date, which enables the calendar popup, or with more flexible entry filters that would not require the punctuation, but not both. We chose to set the Px Date up in a way that enables the pop-up calendar but requires punctuation.
{{Discuss|
- Would it be more valuable to not type punctuation but always have to type the date, or is it better to have to type the punctuation when a time is needed, but be able to pop-up enter the date most of the time.