Px Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) mNo edit summary |
Ttenbergen (talk | contribs) mNo edit summary |
||
Line 13: | Line 13: | ||
The Px Date is coded as part of the [[CCI Collection]]. | The Px Date is coded as part of the [[CCI Collection]]. | ||
* mandatory for procedures with [[Px Type]] '''acquired''' | * mandatory for procedures with [[Px Type]] '''acquired''' / [[Acquired Procedure]] | ||
* not allowed for procedures with [[Px Type]] '''admit''' | * not allowed for procedures with [[Px Type]] '''admit''' / [[Admit Procedure]] | ||
== Data Integrity Checks == | == Data Integrity Checks == |
Revision as of 13:06, 2018 August 23
Data Element (edit) | |
Field Name: | Px Date |
CCMDB Label: | Px Date |
CCMDB tab: | not stated |
Table: | L_CCI_Picklist table, L_CCI_Component table |
Data type: | date |
Length: | not stated |
Program: | Med and CC |
Created/Raw: | Raw |
Start Date: | 1988-07-11 |
End Date: | 2300-01-01 |
Sort Index: | 4 |
The date/time of a CCI procedure
The Px Date is coded as part of the CCI Collection.
- mandatory for procedures with Px Type acquired / Acquired Procedure
- not allowed for procedures with Px Type admit / Admit Procedure