Px Date: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) mNo edit summary |
Ttenbergen (talk | contribs) m Text replacement - "|field_name" to "| CCMDB_tab = CCI |field_name" |
||
Line 1: | Line 1: | ||
{{Data element | {{Data element | ||
| CCMDB_tab = CCI | |||
|field_name=Px Date | |field_name=Px Date | ||
|CCMDB_label=Px Date | |CCMDB_label=Px Date |
Revision as of 00:41, 2019 January 3
Data Element (edit) | |
Field Name: | Px Date |
CCMDB Label: | Px Date |
CCMDB tab: | CCI |
Table: | L_CCI_Picklist table, L_CCI_Component table |
Data type: | date |
Length: | not stated |
Program: | Med and CC |
Created/Raw: | Raw |
Start Date: | 1988-07-11 |
End Date: | 2300-01-01 |
Sort Index: | 4 |
The date/time of a CCI procedure
The Px Date is coded as part of the CCI Collection.
- mandatory for procedures with Px Type acquired / Acquired Procedure
- not allowed for procedures with Px Type admit / Admit Procedure