Px Date
Data Element (edit) | |
Field Name: | Px Date |
CCMDB Label: | Px Date |
CCMDB tab: | CCI |
Table: | L_CCI_Picklist table, L_CCI_Component table |
Data type: | date |
Length: | not stated |
Program: | Med and CC |
Created/Raw: | Raw |
Start Date: | 1988-07-11 |
End Date: | 2300-01-01 |
Sort Index: | 4 |
The date/time of a CCI procedure
The Px Date is coded as part of the CCI Collection.
- mandatory for procedures with Px Type acquired / Acquired Procedure
- not allowed for procedures with Px Type admit / Admit Procedure
|
|
Limitations to field formatting
There have been requests to change this field so collectors don't need to actually type the punctuation components of the date and time. The time component is only needed when there is a second entry on a different unit for the same day (actually, so far it's only required for TISS, see discussion above).
A field can either be set up as a date, which enables the calendar popup, or with more flexible entry filters that would not require the punctuation, but not both. We chose to set the Px Date up in a way that enables the pop-up calendar but requires punctuation.
Discussed 2021-04-21 and decided to keep the default to show the calendar rather than simplify punctuation.
Data Integrity Checks (automatic list)
App | Status | |
---|---|---|
Query check CCI Date | CCMDB.accdb | implemented |