Projects: Difference between revisions
Jump to navigation
Jump to search
Ttenbergen (talk | contribs) removing question because it's addressed |
Ttenbergen (talk | contribs) No edit summary |
||
| (8 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
This page lists | This page lists the projects captured in the [[Entity–attribute–value model of the L_Tmp_V2 table]]. Some of these are part of [[temporary data collection]], some are more permanent values that were convenient to collect this way. | ||
Over time, we have done {{#ask: [[ProjectActive::+]] | format=count }} projects | Generic instruction for collecting this data can be found in [[Tmp Project Collection]]. | ||
Over time, we have done {{#ask: [[ProjectActive::+]] | format=count }} different projects. | |||
== Current projects == | == Current projects == | ||
| Line 10: | Line 12: | ||
| ?ProjectRequestor = Requestor | | ?ProjectRequestor = Requestor | ||
| ?Has StartDate = Start date | | ?Has StartDate = Start date | ||
| format=table | | format=table | ||
}} | }} | ||
== All projects == | == All projects (including legacy projects) == | ||
{{Collapsable | {{Collapsable | ||
| always=All projects | | always=All projects | ||
| Line 32: | Line 33: | ||
{{Related Articles}} | {{Related Articles}} | ||
[[Category: Project | *]] | [[Category:Project | *]] | ||
[[Category:Tmp Project Infrastructure]] | |||
Latest revision as of 15:48, 23 October 2025
This page lists the projects captured in the Entity–attribute–value model of the L_Tmp_V2 table. Some of these are part of temporary data collection, some are more permanent values that were convenient to collect this way.
Generic instruction for collecting this data can be found in Tmp Project Collection.
Over time, we have done 57 different projects.
Current projects
| Project Status | Program | Requestor | Start date | |
|---|---|---|---|---|
| Alias ID collection | active | CC and Med | Internal | 24 April 2015 |
| BedHeldEnd DtTm | active | CC and Med | internal quality check | 1 January 2023 |
| Boarding Loc | active | CC and Med | internal | 20 September 2019 |
| EuroSCORE II | active | CC | Dr. Rizwan Manji | 3 July 2023 |
| ICUotherService | active | CC | ACCU's directors/manager | 5 April 2018 |
| Project ABO TEE | active | CC | Dr. R. Manji, Dr. A. Menkis | 28 January 2013 |
| Project AHC | active | Med | Dan Roberts | 2 July 2025 |
| Project Overstay2 | active | Med | Dan Roberts | 2 July 2025 |
| Service tmp entry | active | CC and Med | internal | 15 October 2020 |
| Transfer Ready DtTm tmp entry | active | CC and Med | internal | 15 October 2020 |
All projects (including legacy projects)
| All projects | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|